Monday 13 November 2017

November update


Carriage washing back in October.


Back to the DMU repairs at the height of the strip down.


A Rare Picture! Bob painting seats accompanied by Alistair.


 Replacing the ceiling panels.


The floor covering down.


Here the floor hatches have had the lino trimmed, the aluminium edges have been replaced and the seat frames are starting to be refitted.


 The finished saloon.

 

More Wagon Repairs

The weedkilling wagon has been in to have a handrail repaired and rope cleats fitted.


This wagon had two rails fitted to enable it to transport the jacker-packer more easily.


While all this was going on the RU had a trip into the daylight.